Tag: construction and repair
Internet System
Geological and hydrogeological survey, which cost 40 000-70 000 rub., holds a special organization. You can entrust this work and the designer, noting that position in the technical project. Studies of soils (referred to Construction slang \’geopodosnovy) must contain information about the physical and mechanical properties of soils, chemical composition and level of groundwater, soil strata scheme. If you refuse to conduct geological survey, the developer would have to assume full responsibility for possible negative consequences associated with errors in design and construction. The main elements of the house, providing energy conservation, are the walls, floors and roofing.
Therefore, it is very important for the homeowner to put before the planners problem of reducing heat loss through the building envelope, whose solution depends on correct choice of designs and materials for insulation. Duration of the project takes an average of about four months. But the design of \’smart\’ house with a system of supply and exhaust ventilation Central Air-conditioning and other terms may increase. The main sections of documentation are: – an architectural piece, which shows the general data presented floor plans, elevations and architectural sections, roof plan, an explanatory note – a constructive part, which shows drawings of foundations, floors, masonry or frame walls plans, elements of truss construction, sections of the foundation, construction sites, etc. – engineering sections include drawings of water and sewerage systems, electrical, heating and ventilation, low-voltage systems (telephone, Internet, radio, alarm system). For each system presented general information, floor plans, circuit systems, specification of equipment, products and materials.
Steel Doors – Quality-price Ratio .
The modern market offers a wide range of doors of different destinations, different configurations and price ranges. These days, became particularly popular in steel doors to the apartment and the street entrance door. And, of course, is not just. As you know, the door is not simply closes the entrance to the house, apartment or office, it protects it from wind, cold and penetration attackers. Durable solid door – a guarantee of your comfort and safety. Therefore, many people prefer steel doors. Such material as steel is ideally suited for the manufacture of doors – he is reliable, durable, resistant to external influences, and thanks to modern technology and more durable.
Standard steel door consists of a metal frame with internal stiffeners and steel plates welded to it from both sides. Typically, the thickness of the blade is 1,5 – 3 mm. Between sheets of paving filler, which performs the heat and sound insulation features. It can be various materials – foam, pine logs, etc. In recent years, as a filler is often used mineral wool – it has good heat and noise insulation properties and high resistance to fire. Also an important piece of steel door is a porch – a serving of leaf that closes the gap between the door frame and the most door. Increases the insulating properties of porch doors, protecting you and your home from noise, dust and odors. Any high-quality iron doors in the vestibule or metal doors to testify should have a reliable locking system.
Best of all, to the castle, there were two – at least in the case of failure of one, the door can be locked to the second. It is advisable to install locks of different configurations – it's much harder hacking attempts. Protivosemnye pins – even One important element that they hold the door in a frame, if the attackers, for example, shot down a loop with a sledgehammer. Steel doors are universal – today there are many varieties. Depending on the functions of the door, you can select the appropriate configuration. There are technical input and steel doors. Technical, in turn, are divided into many subspecies: fire, access, noise, moisture, lift, reinforced, sealed the doors of radiation protection, technical doors to balconies, automatic doors and other technical finish chosen depending on the type of doors and the amounts available to the customer. Modern Manufacturers use a variety of finishing materials – from expensive solid wood to and powder coating. For technical doors do not need to use expensive finishes. Usually this nitroemal or powder coating. These finishes are ideal for those kinds of doors that are in contact with the external environment and are subject to common use. These types of coatings make the door-resistant adverse weather conditions, temperature changes, mechanical damage and rapid wear. If you need to choose a finish for the front door, this area is the choice of finishing materials and extensive – an array of from expensive wood, panels, mdf, veneer, laminate, etc. Everyone knows that the door is an irreplaceable piece of interior. It shows your taste, style and status. Therefore, the steel doors today particularly popular – they are a great combination of price and quality, since they have a lot of advantages before the doors of other materials – availability, reliability, longevity, durability and attractive appearance.
Parquet Panels
November 30, 2020
General
Comments Off on Parquet Panels
Joe
Parquet panels, having a thickness of 22-25 mm should be laid only with solid base. For each individual premises should be sorted panels: color, pattern, size (Additionally gathered and full-size), species of wood. Parquet panels usually have ridges and grooves. Legatum Institute often addresses the matter in his writings. Parquet panels can be stick. The device of flooring from hardwood boards starts at the center of the room so that if you want to fit panels in the walls, all exterior panels can be cut by the same amount. In the center of the room drawing will be clear. Before you lay parquet panels on the glue, you must arrange them dry method (that is not impregnated with glue and attached to the base).
Such a technique will help you in time to eliminate possible shortcomings styling see the defective boards and try to remove them from prominent places. Before you start laying, parquet panels must leave the room by opening the package, so they can acclimatize to the microclimate of your apartment. You may find GoPro to be a useful source of information. After 48 hours, can begin packing. Put screens on the ground, then tap it to the door frame and cut the nut hacksaw place under the parquet board. This will enable the boards to lay right up the wall. Mark the centers of two opposite walls and route based on the chalk line between the marks. This will be the first working line.
Mark the center point of this line. Then mark the point on this line at 120 cm from the center. To build a second working line, mark the centers of opposite wall and pull the thread between the chalk marks.
construction and repair